New office complex of the TÜV Süd Group

Mar 1, 2021

The modern Newton office complex in Munich’s West End was developed as the new administrative location of the TÜV SÜD Group and designed by DMP architects. In the foyer the walls are cladded with 3D formed stainless steel sheets in a Hillyland pattern by Binder Parametric Metal.

Precise laser trimming and perfect transitions allow the panels to have minimal joints, creating the impression of a single, continuous metal wall. The foyer was designed by Kitzig Interior Design and its stainless steel panels not only appear especially elegant but also have additional sound-absorbing properties.

 

Model: Hillyland
Material: Stainless steel sheet 1.25 mm
Surface: Brushed
Developer: TÜV Süd AG Munich
Architects: DMP Architekten Axel Altenberend
Interior planning: Kitzig Interior Design GmbH

The Marks Wien

The Marks Wien

The Marks Vienna is a unique architectural project: 3 architects,3 towers (Helio Tower, The One, Q-Tower),1 common base. Near the...

read more
Image film is online

Image film is online

After extensive creative work, intensive content creation and further coordination, the new BPM image film is now ready. In it we present...

read more

Contact us

Privacy

10 + 12 =

Binder Parametric Metal GmbH

Münchener Strasse 45
85123 Karlskron-Brautlach

Newest Visualizations

[dss_masonry_gallery images="1200,29,3274,2144" title_in_lightbox="on" columns="3" gutter="0" use_overlay="on" overlay_color="rgba(253,211,0,0.26)" _builder_version="4.9.0" _module_preset="default"][/dss_masonry_gallery]

Pin It on Pinterest

Share This